Top quality double beams or girders load and unload rail electric traveling frame crane
The pick-up device of the loading and unloading bridge is mainly composed of double rope grab or other spreaders, and its working objects are large quantities of bulk materials or batch articles.
Commonly used in power plants, stations, ports, forest freight yards and other occasions.
Usually, the loading bridge is measured and selected by productivity.
Double beams or girders load and unload rail electric traveling gantry crane | ||
Weight | 5 ton | 10 ton |
Span | 40m | 50m |
Lifting height | 6~30m | 6~30m |
Working class | A7 | |
Lifting speed | 50.32m/min | 64.3m/min |
Cross speed | 182.9m/min | 194.3m/min |
Traveling speed | 26.1m/min | 26.1m/min |
Grab Volume | 1.5M3 | 1.5M3 |
Grab unit weight | >1-1.7t/m3 | >1-1.7t/m3 |
Scuttle Volume | 27m3 | 27m3 |
Scuttle Volume max.unit weight | 0.8-10t/m3 | 0.8-10t/m3 |
Power source | 380V 50Hz,3Phase or Customized |
Safety system